In-article:

Eiffage wins a contract for the transition parts of a wind farm – 06/21/2022 at 18:10


(AOF) – Eiffage, through Smulders (Belgian subsidiary of Eiffage M├ętal), won, in a consortium with the Dutch company Sif, the contract awarded by EnBW, a German energy company, for the manufacture of 64 transition parts for the future fleet. offshore wind farm EnBW He Dreiht. The transition pieces will be manufactured in Smulders’ English factory located in Newscastle upon Tyne. Their production will begin in the first half of 2023 and should be completed the following year.

AOF – LEARN MORE

Postponement of the waste recycling sector

Professionals believe that subjecting construction materials and products to the eco-contribution in order to recycle building waste could increase prices by 5% to 10%, which is well above the 2.5% to 3% estimated by the Ecological Transition Agency. In addition, building craftsmen must know well enough in advance the amount of eco-contributions to be paid on their purchases, to take this into account in their quote. However, there is still no scale of eco-contributions. Faced with the inflationary shock and taking into account the delay, the new sector should start operating from 2023 and ramp up over three to four years.



Source link -86