Elia /: Minister Dermagne visits the Arcadis Ost platform in Aalborg








April 15, 2022

Minister Dermagne visits the Arcadis Ost platform in Aalborg

On Thursday 14 April, Elia Group teams welcomed the Deputy Prime Minister and Minister for the Economy and Employment, Pierre-Yves Dermagne, to the construction site of the Arcadis Ost platform in Aalborg, Denmark.

This platform is being built jointly by 50Hertz (Elia Group) and Parkwind in order to be able to optimally integrate the electricity that will be produced from 2023 by the future wind farm in the Baltic Sea Arcadis Ost.

Arcadis Ost is an offshore wind farm in the Baltic Sea, located 19 km off the German coast. Its wind turbines will produce 247 MW of offshore wind energy and generate enough green energy to power around 290,000 homes. The park should be operational in the first quarter of 2023.

The new platform, also known as Arcadis Ost, whose construction is nearing completion, will make it possible to pool the energy produced at sea in an efficient and safe manner. It will transform the energy from the wind turbines (33 kV) into 220 kV and then bring it to the mainland via an undersea cable which will join the 50Hertz high voltage station located in Lubmin. The platform will be 35 meters long and 23 meters wide. It will rise 32 meters above sea level thanks to a mono-pillar which is among the widest in the world. Once completed and equipped, the upper part of the platform will be transported by boat and installed at sea before the end of this year.

For more than 15 years, Belgium has been one of the world leaders in the development of Offshore electricity production and the two Belgian companies (Elia Group and Parkwind) can rely on a very broad expertise to present new ever more innovative projects inside or outside our borders. The CEOs of the two companies and a delegation of journalists accompanied the Minister’s visit. The day before, a German delegation had also taken part in the site visit.

General informations

This section contains press releases containing regulated information and other information relating to the Elia Group.

John Fassiaux

FR spokesperson Elia Belgium

Disclaimer

Elia System Operator SA published this content on April 15, 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on Apr 15, 2022 10:39:58 AM UTC.

Publicnow 2022

All the news about ELIA GROUP NV/SA

Analyst recommendations on ELIA GROUP NV/SA
01/26ANALYST OPINION OF THE DAY : Amundi, Rémy Cointreau, Faurecia, Soitec, Somfy, Richemont, ADP..
2019PARIS STOCK EXCHANGE : Two steps back, one step forward!
2019ANALYST OPINION OF THE DAY : Airbus, Groupe ADP, Tarkett, Solutions 30, Boskalis, Polyphor, ..

2021 turnover 2,564M
2,771M
2021 net result 259M
280M
Net debt 2021 7,880M
8,517M
PER 202140.6x
2021 performance1.15%
Capitalization 10,483M
11,330M
VE / CA 20217.16x
VE / CA 20227.53x
Number of employees2,750
Floating41.8%

Chart ELIA GROUP NV/SA


Hard :

Period:




Elia Group NV/SA: Chart technical analysis Elia Group NV/SA |  Market area

Trends technical analysis ELIA GROUP NV/SA

Short termMiddle termLong term
Trendsbullishbullishbullish

Evolution of the Income Statement

Sale

Purchase

Average recommendationKEEP
Number of Analysts3
Last Closing Price€152.70
Average price target€123.83
Deviation / Average Target-18.9%

Officers and Directors




Source link -88