(CercleFinance.com) – Metalliance, a subsidiary of the Gaussin Group specializing in the study and production of industrial equipment and mobile machinery, announces an order for 3 electric underground mobile machinery intended for digging the extension of the line Cross Island Phase 1 of the Singapore Metro.
‘These 3 e-VMS are mainly intended for the transport of segments, the transport of concrete and various logistics’, indicates the subsidiary.
The contract includes the design, manufacture, assembly, delivery and on-site commissioning of these 3 vehicles, which should be delivered by spring 2023.
The line will be built in three phases with completion scheduled for 2030.