Lhyfe: long-term electricity sales contract with Kallista Energy







Photo credit © Arnaud Bivès

(Boursier.com) — The town of Brachy, in Seine-Maritime, has been home to a park of 5 wind turbines for almost 17 years. Kallista Energy, owner and operator of the park, will renew these wind turbines with the latest generation machines. Thus, with the same number of wind turbines, the new park will be able to produce 70% more electricity than the old one.

Bank financing for the renewal of the Brachy wind farm was secured thanks to the long-term electricity sales contract (cPPA) concluded between Kallista Energy and Lhyfe for a period of 15 years.

The renewed Brachy park will accommodate 5 Vestas V126 wind turbines, for a total power of 15 MW. Its commissioning will take place in the summer of 2024, it will produce 46 GWh of renewable electricity each year. The entire production of the park will be dedicated to Lhyfe’s green and renewable hydrogen production sites to contribute to the decarbonization of mobility and industry which currently use fossil fuels or carbon hydrogen.


©2023 Boursier.com






Source link -87