Return traffic from the south – traffic jam in front of the Gotthard south portal is slowly dissipating – News

  • The return wave from the south is slowly rolling in.
  • On Friday afternoon, cars were backed up in front of the south portal of the Gotthard tunnel over a length of ten kilometers.
  • In the evening, the traffic jam was reduced to three kilometers.

On the north side, the waiting column between Amsteg and Göschenen UR was five kilometers long, which resulted in a loss of time of around 50 minutes. The TCS recommended the San Bernardino route on Twitter as an alternative.

The school holidays in Canton Aargau are the first Swiss canton to end on Monday. School will also start again next week in the most populous German state of North Rhine-Westphalia.

source site-72