Southbound traffic – Eleven kilometers of traffic jams in front of the Gotthard north portal – News

  • Heavy passenger traffic has once again pushed the Gotthard route to its capacity limits.
  • In the south, the vehicles are backed up on Saturday afternoon over a length of more than ten kilometers.
  • To the north it is currently six kilometers.

The eleven-kilometer traffic jam in front of the Gotthard north portal in the southbound direction between Erstfeld and Göschenen in the canton of Uri shortly after 11 a.m. means a loss of time of up to one hour and 50 minutes, according to the traffic information from the Swiss Touring Club (TCS). was taken.

At the same time, vehicles traveling north on the A2 motorway are also bumper to bumper. Between Quinto and the Airolo dosing point rest area in Ticino, the length of the stationary motorcade is initially five kilometers. This means a loss of time of up to one hour.

Traffic on the A1 autobahn has also slowed down at times, for example at the Härkingen and Oensingen junction or in the Zurich area.

source site-72