Tourist traffic on the roads – Long traffic jam in front of the Gotthard – both directions closed – News

  • A long traffic jam had already formed in front of the Gotthard road tunnel early on Saturday morning.
  • At around 4:30 a.m., the motorcade stretched over ten kilometers between Erstfeld and Göschenen.
  • Viasuisse reported that the waiting time was over 2 hours because the Gotthard tunnel was closed in both directions due to a breakdown vehicle.

The loss of time during the morning was up to 1 hour and 50 minutes, as the Touring Club Switzerland (TCS) announced on Twitter. Due to a breakdown vehicle blocking the tunnel, the entire Gotthart was later closed in both directions.

The current traffic situation can be found here


open box
close the box

The current traffic situation and reports from all over Switzerland and the Gotthard can be found here.

After that, the waiting time was more than 2.5 hours, according to the traffic information service Viasuisse. The entrance to Göschenen was closed on Saturday morning.

source site-72