Ile-de-France: the ghost metro of Noisy-le-Grand soon to be rehabilitated?


Few know it, but there is a metro line in the basements of Noisy-le-Grand, in Seine-Saint-Denis (93). Abandoned before it even existed, the old Mont d’Est metro line will soon be rehabilitated. For this, the municipality will launch a call for projects this Friday, April 8.

With a length of 518 meters and equipped with two terminals, this “last mile” metro was designed in the 1990s to connect the Mont d’Est RER station to the extension project of the Maille business district. Skyline, located west of the city. But the promoter had gone bankrupt, leaving the project and the space completely abandoned ever since.

It was only very recently, at the instigation of the mayor of Noisy-le-Grand, Brigitte Marsigny, that the project to rehabilitate this abandoned space of more than 2,500 m2 saw the light of day, as part of a more across an entire neighborhood.

For the mayor – who has the ambition to “restore the surroundings of the station and the slab, on its two levels and redo the esplanade of the Paris Commune” – it was indeed necessary to bring life back to the “not very attractive” district. from the Mont d’Est RER station as well as the Maille Horizon business district.

“An industrial failure in the history of the city”

“That’s when I discovered this ghost train that had never been used, with its cabins that look like cable cars,” explains the one who is also vice-president of the Grand-Paris-Grand- Is.

A real “industrial failure” according to the mayor, who says that she was “stunned by this underground cathedral where passionate artists were able to express a form of underground art […] I had the intimate conviction that it was necessary to return this magic place to the public”, she explains.

After a few months of delay linked to the health crisis, his project – called “Station K” – is now on track, aiming to “create a lively and lively hybrid place, bringing together on the same site a friendly brasserie, bar areas and troglodyte café, a possible performance hall, a climbing wall, an exhibition space and a varied cultural and sports program”.

And the chosen one is open to everything and even imagines coupling the 5,000 m2 of agriculture on slabs installed in the open air with an underground agricultural space. “Why not set up a mushroom house in the basement of the metro, or a space to grow strawberries or asparagus?” She wonders.

A call for projects launched this Friday

To achieve this, the municipality will therefore launch a call for projects this Friday, the first phase of which is called “project intentions” and is open to all. Investors, restaurateurs, professionals in events, sport or culture, graffiti artists or company managing climbing walls: Brigitte Marsigny ensures that she will study “everything that is interesting”.

With, in the long term, the idea of ​​setting up a group of projects, capable of ensuring the event aspect but above all of holding the purse strings. “Of course, if anyone can get started, they will still have to provide information and assurances on the financial side,” warns the mayor.

And the results of this call for projects should be unveiled this summer, with a first selection of three proposals. These “finalists” will then have a few days to “improve their file” and “enter into the discussion phase with the developer”. It should be noted that the latter, the company Socaren, has already begun work to improve accessibility.

However, we will have to wait until the end of 2022 to find out the big winner of the call for projects, then a few years of work between 2023 and 2025 so that Noiseans can take advantage of this new place of culture and leisure, which should open at the end of 2025. The only imperative for the mayor: that it open “before the next municipal elections”.





Source link -80